Explore Other Data Centres:

Central Washington Data Centre

Commitment to Compliance

CenturyLink is dedicated to continuously improving and maintaining compliance and standards that are critical to customers.

Great Disaster Recovery Location: Check Out Low Cost Hydropower in Central Washington

Built to maximise security, resilience utility and spend, the Moses Lake data centre in Central Washington provides colocation solutions and access to multiple network providers including diverse fibre access to the CenturyLink network. This remote data centre takes advantage of free air cooling and hydropower, in a low risk location that makes it an ideal spot for disaster recovery and non-latency sensitive workloads.

Our Moses Lake facility taps the abundant hydroelectric power available in Central Washington to provide more than 85 percent of the utility power supplied to this facility-making it not only a low carbon footprint hosting solution, but also one of the most cost-effective colocation options in North America. The data centre will have an initial 8 megawatts but will ultimately support up to 30 MW of IT load.

Moses Lake provides the full breadth of colocation options. With over 250,000 SF of available space coupled with 40 MW Critical Load on an adjacent 11 acres, this location provides the ability to customise a data centre environment by offering a build-to-suit option.

 

 

 

 

Announcements

Take a Virtual Tour of our CW1 Data Center

Data Centres

Moses Lake Data Centre Locations

Locations

CW1: Moses Lake, WA

Space: 306,970 sf   Power: 40 MW

Tech Specs

CW1: Moses Lake     Space: 136,000 sf     Power: 40 MW

Real Estate Summary

  • Located in Moses Lake, central Washington
  • Former Command and Control Facility
  • (Built to Withstand a 10 Megaton Bomb at .25 Mile)
  • Geologically Stable – 2B Seismic Rating – Lowest in the Western U.S.

Electrical Summary

  • Building Served by New Utility Substation with Redundant Transformers and Feeds
  • Power density minimum (W/sf) = 175
  • Utility Power Mix to the Facility is 85% Renewable (Hydro)
  • Generator configuration = N + 1
  • Access to over 40 MW Power
  • Minimum two fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection

Mechanical Summary

  • Cooling system configuration = N + 1
  • CenturyLink manages temperature and humidity to strict ASHRAE standard

More Locations

Over 60 Data Centre Locations Worldwide

Latest from the EpiCenter Blog

Talking Trends: The Data Centre Industry in 2017

Drew Leonard | January 26,2017

January is often a time to look toward a new year and perhaps find ways to improve from the one prior. It's also a time for people to forecast what might happen in the near year, whether it's a new … Read more…→ The post Talking Trends: The Data Centre Industry in 2017 appeared first on CenturyLink EpiCenter Blog.

Network Diversity: Expanded Options

Chip Freund | January 20,2017

Having a lot of options is usually a good thing, especially when investing a lot of money through a purchase. For example, many people buy cars, but some buy them to fit a family with small children whilst others buy … Read more…→ The post Network Diversity: Expanded Options appeared first on CenturyLink EpiCenter Blog.

CenturyLink Data Centres: Building Carrier Density and Cloud Connectivity

Jonathan Martone | January 18,2017

The best technology likely won't work correctly if it's not operated correctly. You can buy the most expensive computer available, but it won't of much use to you if you don't know how to utilise it. CenturyLink has established itself … Read more…→ The post CenturyLink Data Centres: Building Carrier Density and Cloud Connectivity appeared first on CenturyLink EpiCenter Blog.

CenturyLink
Business
@CenturyLink ENT

Resources

Get Started with Featured Resources and Tools

Get Started
Request Consultation

Request Consultation

Call Us

Call Us

SALES: +44 (0) 207 400 6000 
SUPPPORT: 00 800 72 884 743

Get Connected. See What's Next for Business.