Explore Other Data Centres:

London Data Centres

Commitment to Compliance

Cyxtera is dedicated to continuously improving and maintaining compliance and standards that are critical to customers.

UK Data Centres: Connecting London and the South East to global markets

Inside the footprint of 60+ Cyxtera data centres around the globe, technology becomes more agile, secure and sustainable.

We augment traditional colocation solutions with a comprehensive hybrid suite of managed services and cloud, so companies can grow without barriers or penalties.

Cyxtera's portfolio of 5 UK Data Centres consists of campuses in London Docklands, Slough, and Reading, interconnected by direct low-latency fibre routes. The two London Data Centres provide proximity to key financial trading and foreign exchange platforms, as well as providing hosting facilities to London's growing legal and professional services sector. The Slough and Reading facilities are ideally situated for the Hi Tech sector located along the M4 corridor and the geographical distribution of our secure UK Data Centres make Cyxtera an intelligent choice for clients seeking fully resilient dual data centre solutions and disaster recovery services.

Announcements

Take a Virtual Tour of the LO5 Data Centre

Data Centres

London Data Centre Locations

Locations

LO1: Slough, UK

Space: 69,539 sf   Power: 13.5 MW

Tech Specs

LO1: Slough     Space: 69,539 sf     Power: 13.5 MW

Real Estate Summary

  • Located near London Heathrow International Airport; 15 minutes from London
  • Two storey building
  • Total building interior (sf) = 69,539
  • Raised floor (mm) = 800

Electrical Summary

  • Southern Electric provides power feeds
  • Power density minimum (W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 13.5 MW
  • Minimum one fuel replenishing company

Fire Detection and Suppression Summary

  • VESDA provides early warning detection

Mechanical Summary

  • Cooling system configuration = N +1
  • Temperature and humidity managed to strict ASHRAE standard

LO3: London, UK

Space: 34,850 sf   Power: 1.5 MW

Tech Specs

LO3: London     Space: 34,850 sf     Power: 1.5 MW

Real Estate Summary

  • Located near London City and Heathrow Airports; 20 and 50 minute drive from London
  • Two storey building
  • Total building interior (sf) = 34,850
  • Raised floor (mm)=600

Electrical Summary

  • Southern Electric provides power feeds
  • Power density minimum(W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 1.5 MW
  • Minimum one fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • FM200

Mechanical Summary

  • Cooling system configuration = N+1
  • Temperature and humidity managed to strict ASHRAE standard

LO4: London, UK

Space:  14,488 sf   Power: 7 MW

Tech Specs

LO4: London     Space: 14,488 sf     Power: 7 MW

Real Estate Summary

  • Located near London City and Heathrow Airports; 20 and 50 minutes from London
  • Eight storey building
  • Total building interior (sf) = 14,488
  • Raised floor (mm) = 400

Electrical Summary

  • UKPN provides power feeds
  • Power density minimum(W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 7 MW
  • Minimum one fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • FM 200

Mechanical Summary

  • Cooling system configuration = N+1
  • Temperature and humidity managed to strict ASHRAE standard

LO5: Slough, UK

Space: 110,864 sf   Power: 13.5 MW

Tech Specs

LO5: Slough     Space: 110,864     Power: 13.5 MW

Real Estate Summary

  • Located near London Heathrow International Airport; 15 minutes from London
  • Two storey building
  • Total building interior (sf) = 110,864
  • Raised floor (mm) = 800

Electrical Summary

  • Southern Electric provides power feeds
  • Power density minimum(W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 13.5 MW
  • Minimum one fuel replenishing company

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • FM 200

Mechanical Summary

  • Cooling system configuration = N +1
  • Temperature and humidity managed to strict ASHRAE standard

LO6: Reading, UK

Space: 308,405 sf   Power: 6 MW

Tech Specs

LO6: Reading     Space: 308,405 sf     Power: 6 MW

Real Estate Summary

  • Located near London Heathrow International Airport; 15 minutes from London
  • Two storey building
  • Total building interior (sf) = 308,405
  • Raised floor (mm) = 600 and 800

Electrical Summary

  • Southern Electric provides power feeds
  • Power density minimum(W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 6 MW
  • Minimum one fuel replenishing company

Fire Detection and Suppression Summary

  • VESDA provides early warning detection

Mechanical Summary

  • Cooling system configuration = N +1
  • Temperature and humidity managed to strict ASHRAE standard

More Locations

Over 60 Data Centre Locations Worldwide

Latest from the EpiCenter Blog

Innovations in Data Centre Connectivity

Michael Levy | April 18,2017

Many businesses must avail themselves of the latest technology to remain competitive in their industry. For instance, many car manufacturers now include backup cameras, Bluetooth and GPS capabilities and in-car Wi-Fi in their newer models. Newer vehicles without those technologies … Read more…→ The post Innovations in Data Centre Connectivity appeared first on CenturyLink EpiCenter Blog.

Business Continuity Planning: The Distributed Data Centre Approach (Part Two)

Chip Freund | April 05,2017

As I discussed in my most recent blog, some companies utilise a distributed data centre approach to achieve redundancy, scalability and high availability as part of their plan for business continuity. It enables businesses to help mitigate disasters that can … Read more…→ The post Business Continuity Planning: The Distributed Data Centre Approach (Part Two) appeared first on CenturyLink EpiCenter Blog.

Data Centre World Global - Unleashing the Power of Colocation

David Murphy | April 03,2017

The greatest ideas - the most impactful innovations - come from recognising an opportunity and then trying new approaches. As I look forward to the Data Centre World Global meeting to be held in Los Angeles, I think about what … Read more…→ The post Data Centre World Global - Unleashing the Power of Colocation appeared first on CenturyLink EpiCenter Blog.

CenturyLink
Business
@CenturyLink ENT

Resources

Get Started with Featured Resources and Tools

Get Started
Request Consultation

Request Consultation

Call Us

Call Us

SALES: +44 (0) 207 400 6000 
SUPPORT: 00 800 72 884 743

Get Connected. See What's Next for Business.
CenturyLink has sold its data centres and associated colocation business to a consortium led by BC Partners and Medina Capital Advisors. This move led to the creation of a bold, new company, Cyxtera Technologies, comprised of world-class talent and technology. CenturyLink will continue to work closely with Cyxtera and the same strong team that has operated the data centres successfully for years and who will continue to deliver world-class customer service and Operational Excellence for all colocation customers.